Commercial Push Pier Installation in Florida

Commercial Push Pier Systems

The FSI Push Pier System utilizes high-strength round steel tubes and a load transfer bracket (retrofit foundation repair bracket) to stabilize and/or lift sinking or settling foundations. The foundation bracket is secured against the existing footing and pier sections are driven hydraulically through the foundation bracket and into the soil below using the combined structural weight and any contributory soil load as resistance. Pier sections are continuously driven until a suitable load-bearing stratum is encountered. At that point, the structure either begins to lift or the target pressure/load is achieved. The weight of the structure is then transferred from the unstable soil, to the foundation brackets, through the piers, and to firm load-bearing soil or bedrock.

The FSI Push Pier System develops a factor of safety against pier settlement by the pier installation methods used and the sequence with which multiple piers are driven and then re-loaded. Piers are first driven individually using the maximum weight of the structure and any contributory soil load. After all of the piers are driven, the piers are re-loaded simultaneously, and the total reaction load is distributed over the multiple pier locations. Since the average load on each pier during the load transfer operation is less than the load during pier installation/driving, a factor of safety against settlement is achieved. Typical factors of safety against pier settlement range from about 1.5 to 3.0, with higher values generally achieved for structures with greater rigidity. These factors of safety conservatively ignore any additional long-term frictional component to the pier's capacity (see below for more information).

Foundation Supportworks™ Model 288 Pier System Specifications

  • Bracket: Weldment manufactured from 0.25", 0.375", and 0.50"-thick steel plate. Yield strength = 36 ksi (min.), tensile strength = 58 ksi (min.).
  • External Sleeve: 3.50" OD x 0.216" wall x 30" or 48" long with sleeve collar welded to one end. Yield strength = 50 ksi (min.), tensile strength = 62 ksi (min.).
  • Pier Starter Tube: 2.875" OD x 0.165" wall x 50" long, triple-coated in-line galvanized. Yield strength = 50 ksi (min.), tensile strength = 55 ksi (min.). 3.375" OD x 0.188" wall x 1" long friction reducing collar welded to one end.
  • Pier Tube: 2.875" OD x 0.165" wall x 36" long, triple-coated in-line galvanized. Yield strength = 50 ksi (min.), tensile strength = 55 ksi (min.). 2.50" OD x 0.180" wall x 6" long internal coupler at one end with 3" extending out of pier tube.
  • Pier Cap: 5.0" wide x 9.0" long x 1" thick plate with confining ring welded to one side. Yield strength = 50 ksi (min.), tensile strength = 65 ksi (min.).
  • All-Thread Rod: 0.75" diameter x 16" long, zinc plated, Grade B7, tensile strength = 125 ksi [min.].
Push Pier Capacity Chart

Design Considerations

Push piers are installed directly adjacent to the existing structure utilizing side-load brackets. This introduces eccentricity into the system. The Model 288 Push Pier System incorporates an external sleeve at the top of the pier to aid in resisting the bending forces generated by this loading condition. This helps preserve the axial compressive capacity of the pier shaft. The external sleeve extends through and below the foundation bracket to essentially create a bracket that is 48 inches tall.

The moment or bending force is localized within a relatively short distance below the bracket. Although the bending force is dissipated quickly by the pier bearing against the confining soil, it is significant and cannot be ignored. The depth or length of sleeve and pier over which the bending force dissipates is a function of the soil stiffness near the surface. The depth is greater in soft clay and loose sand, and less in stiff clay and dense sand. In soft or loose soils, a small portion of the bending force may be transferred to the pier below the sleeve, thereby reducing the pier's allowable axial compressive capacity. A modified, lower capacity system is also available with a shorter, 30-inch long sleeve for low headroom applications.

Friction Reducing Collar

The first pier section advanced into the ground includes a larger-diameter "friction reducing collar" welded to the lead end. This collar, being larger in diameter than the pier tube, effectively creates annular space around the pier as it is advanced through most clayey soils. In soft clay or clean sand and gravel, an annular space may only temporarily be created. However, the larger diameter collar causes soil disturbance or remolding to occur, which also significantly reduces frictional resistance on the outside surface of the pier during driving. The result is a driven pier that generates most of its capacity in end bearing. Over time, the soils surrounding the pier relax back into the annular space and against the pier shaft. This provides an additional frictional component to the pier's capacity. Even though this frictional capacity may be significant, it is conservatively ignored in the determination of the pier's factor of safety against pier settlement.

Foundation Repair Contractors
Serving South Florida

Click to See our Full Coverage
Foundation Repair Service Area

Call 1-866-562-1759 to talk to a representative
RECENT TESTIMONIALS:

"N Square, Inc. was easy to work with, arrived to the jobsite as scheduled and completed the tasks as required."
Testimonial by Charles D S. from Pembroke Park, FL

More Testimonials
Before and After
   
Areas we serve:
Cities in Broward County, FL
Coconut Creek
Coral Springs
Dania
Deerfield Beach
Fort Lauderdale
Hallandale
Hollywood
Lighthouse Point
Margate
Pembroke Pines
Plantation
Pompano Beach

Cities in Charlotte County, FL
El Jobean
Englewood
Murdock
Placida
Port Charlotte
Punta Gorda
Rotonda West

Cities in Collier County, FL
Chokoloskee
Copeland
Everglades City
Goodland
Immokalee
Marco Island
Naples

Cities in De Soto County, FL
Arcadia

Cities in Glades County, FL
Moore Haven
Palmdale

Cities in Hardee County, FL
Bowling Green
Ona

Cities in Hendry County, FL
Clewiston
Felda
Labelle

Cities in Highlands County, FL
Avon Park
Lake Placid
Lorida
Sebring
Venus

Cities in Indian River County, FL
Vero Beach

Cities in Lee County, FL
Alva
Boca Grande
Bokeelia
Bonita Springs
Cape Coral
Captiva
Estero
Fort Myers
Fort Myers Beach
Lehigh Acres
North Fort Myers
Pineland
Saint James City
Sanibel

Cities in Manatee County, FL
Bradenton
Bradenton Beach
Ellenton
Longboat Key
Myakka City
Palmetto
Parrish
Sarasota

Cities in Martin County, FL
Hobe Sound
Indiantown
Jensen Beach
Palm City
Stuart

Cities in Miami-Dade County, FL
Coral Gables
Hialeah
Homestead
Key Biscayne
Miami
Miami Beach
Miami Gardens
North Miami Beach
Ochopee
Opa Locka

Cities in Monroe County, FL
Big Pine Key
Islamorada
Key Colony Beach
Key Largo
Key West
Long Key
Marathon
Marathon Shores
Summerland Key
Tavernier

Cities in Okeechobee County, FL
Okeechobee

Cities in Palm Beach County, FL
Belle Glade
Boca Raton
Boynton Beach
Canal Point
Delray Beach
Greenacres
Jupiter
Lake Harbor
Lake Worth
Loxahatchee
North Palm Beach
Pahokee
Palm Beach
Palm Beach Gardens
Royal Palm Beach
South Bay
Wellington
West Palm Beach

Cities in Saint Lucie County, FL
Fort Pierce
Port Saint Lucie

Cities in Sarasota County, FL
Englewood
Nokomis
North Port
Osprey
Sarasota
Venice

Please call us at: 1-888-638-4091
N Square is a Smart Vent Authorized Installer in South Florida